Monthly Archives: June 2012

B-factor and penetration resistance

There is sometimes confusion (or unwarranted conservatism) over factor B in the penetration resistance calculations required by AS 2885 and described in Appendix M.  I look at it this way: B = 0.75 provides the borderline between penetration / no … Continue reading

Posted in External interference, Pipeline design, Standards | 8 Comments